Pick the lane, then the page
Atlas stays easier to scan when the route map reads like navigation first. Start with the lane that matches your question, then expand the full page-job model only when you need the deeper contract details.
Shortest whole-site overview before you choose a deeper page.
Change pace: Usually current for a while, but revisit when routes, ownership, or workflows shift.
Move to a specific contract once you know whether you need ownership, systems, or action.
Open Projects & ChartersEntry
Use these pages when you are still orienting and need the safest first click before you pick an owner or system.
Ownership
Use these pages when your real question is who should handle the work, how it moves, or which charter owns the surface.
Systems
Use these pages when you need the map, structure, services, and interfaces behind the network instead of the people or routing rules.
Operations
Use these pages when something feels broken, you need a concrete next check, or you need the live-status companion surface.
Lifecycle Model
Keep the stage answer here, then jump sideways once the missing answer becomes handoff shape, execution owner, or the shorter district summary.
Stay here for Seed maturity, promotion checks, execution-state health, and the harvest loop.
Seed
Early shaping. The problem is visible, but the Seed still needs enrichment before Grafton can judge readiness.
Grafton watches for Draft Seeds with no enrichment activity for 2+ weeks and flags them back to the owner.
The Seed is mature enough for a real gate check. This is the handoff point into the promotion criteria below.
Stay here when the question is whether the Seed has enough proof to become real execution work.
The Seed passed the gate and now spawns one or more concrete Work Items for the right execution agents.
Leave the Seed lane once the work exists as a scoped execution unit with an owner and sponsor.
The idea stays parked until its wake condition is met instead of pretending to be active work.
Grafton surfaces Dormant Seeds again when the wake condition lands or a wake date passes.
Promotion Gate
Promotion is a proof check, not a vibes check
Work Item
The slice exists, the owner is clear, and execution can begin without another lifecycle rewrite.
This is the state that proves the promotion gate produced a real unit of work instead of a vague promise.
Normal execution state. Grafton is watching for movement, not micromanaging the implementation.
Use this when the question is whether the work is healthy quiet or silent drift.
Execution hit ambiguity that needs sharper scope, policy input, or a sponsor decision.
Repeated Clarify to review loops are a signal to route the issue to Atticus or the sponsor rather than letting it spin.
The work is done enough to inspect, but not yet closed.
Grafton watches this state as part of lifecycle health, not as a code-review authority.
The work crossed the finish line and is about to trigger harvest.
This is the moment where result summary quality matters more than more status narration.
Execution is complete and the loop can now close or wake the next Seed.
Stay here only long enough to run the harvest loop and update the parent Seed correctly.
Annual vs. perennial work
Harvest Loop
- 1.Verify that the result summary is filled in. If the proof is missing, Grafton routes back to the owner before pretending the work is truly done.
- 2.Check Dormant Seeds for wake conditions that this result just satisfied, and reactivate the ones that are now unblocked.
- 3.If the result implies follow-on opportunities, create linked Draft Seeds so the next crop starts with context instead of from scratch.
- 4.Update the parent Seed only when all related Work Items are complete, so lifecycle truth stays honest.
Runs at 10:00 and 22:00 CT (cron "0 10,22 * * *"). Gate checks for new or changed Seeds and Work Items, stale-item detection, and harvest triggers when something reaches Approved or Done.
Runs at 03:30 CT (cron "30 3 * * *"). What moved, what stalled, and which lifecycle events genuinely need human attention.
Runs Mondays at 05:50 CT (cron "50 5 * * 1"). Project-level trend review: dormant wake conditions, perennial rhythm, and whether the garden is producing more than it is accumulating.
Cadence source: Grafton's live gateway roster, verified during the October 2 cron-roster convergence pass. The registry's stewardship charters run their own registry-verbatim cadences β Pruning Shears every six hours, Watering Bucket twice-daily, Rake daily with a weekly synthesis, and Trellis recurring β rendered on the Grafton district page.
If the lifecycle answer is clear but the next move still is not, switch once: Capabilities for owner lookup or Coordination for the handoff pattern.