Skip to content
🧭
Top-level route contracts

Pick the lane, then the page

Atlas stays easier to scan when the route map reads like navigation first. Start with the lane that matches your question, then expand the full page-job model only when you need the deeper contract details.

Current lane: Entry
HomeHere

Shortest whole-site overview before you choose a deeper page.

Start hereCurrent pageSteady

Change pace: Usually current for a while, but revisit when routes, ownership, or workflows shift.

Best next move
Then choose a route family

Move to a specific contract once you know whether you need ownership, systems, or action.

Open Projects & Charters
Start here

Entry

Use these pages when you are still orienting and need the safest first click before you pick an owner or system.

3 pages
HomeHere

Shortest whole-site overview before you choose a deeper page.

Steady
Getting Started

Guided first-five-minutes path for readers who want a tour instead of a reference page.

Steady
FAQ

Question-first shortcut when the reader starts with confusion instead of a route plan.

Steady
Who owns the work

Ownership

Use these pages when your real question is who should handle the work, how it moves, or which charter owns the surface.

4 pages
Projects & Charters

Charter and surface ownership map for the network.

Steady
Capabilities

Worker-selection page for choosing the right agent and understanding execution boundaries.

Steady
Coordination

Decision-and-handoff layer for how work gets routed between people, agents, and systems.

Steady
Workflows

Execution-story page for how real work usually unfolds from intake to visible closeout.

Steady
How the network is built

Systems

Use these pages when you need the map, structure, services, and interfaces behind the network instead of the people or routing rules.

5 pages
Network Topology

Whole-network reference map of agents, systems, and relationships.

High-change
Architecture

Rationale layer for why the network is shaped this way and what tradeoffs drove it.

Stable reference
Bridge

Communication-system page for how agents ask, hand off, and consult one another.

Steady
Infrastructure

Platform-surface page for where the network runs and which services or access layers support it.

High-change
API Reference

Interface reference for endpoints, payloads, and package-level service details.

Steady
What to do when it hurts

Operations

Use these pages when something feels broken, you need a concrete next check, or you need the live-status companion surface.

2 pages
Troubleshooting

Symptom-first page for named failures, first checks, and practical fixes.

High-change
Watchtower Guide

Operational companion page for when the question is about live health and current status rather than static explanation.

High-change
Grafton deep dive

Lifecycle Model

Use this page when the real question is where a Seed or Work Item sits in the lifecycle, what Grafton checks next, and when the work should leave this route for ownership or handoff detail.
Validated Β· Oct 6, 2026The Grafton proof still matches the district contract, the Seed-to-harvest stage model, and the phone-first exits that keep handoff, owner, and district pivots visible before the lower lifecycle sections begin. The October 6 cron-roster convergence pass re-anchored this page's digest cadence teaching onto Grafton's verified live gateway roster β€” Arbor Cycle twice daily, Nightly Observer daily, Weekly Reflector Mondays β€” retiring the unverifiable hourly-sweep cadence. The September 26 pass before it paired this page's freshness proof with its share-preview head projection β€” og/twitter metadata derived from the same title and description the page already publishes; visible page content is unchanged.
Use Lifecycle Model for readiness and statusHere

Stay here for Seed maturity, promotion checks, execution-state health, and the harvest loop.

Best first question β†’ What lifecycle stop is this in?
Go to Capabilities for the worker

Open Capabilities when the lifecycle answer is clear but you still need the right execution owner.

Open Capabilities
Go to Coordination for the handoff

Open Coordination when the remaining question is how the lifecycle finding should be routed or escalated.

Open Coordination
Phase 1

Seed

Every initiative starts as a Seed: a lightweight idea record with a named owner, rough upside, and enough context for Grafton to judge whether it should keep growing or stay parked.
Draft

Early shaping. The problem is visible, but the Seed still needs enrichment before Grafton can judge readiness.

Grafton watches for Draft Seeds with no enrichment activity for 2+ weeks and flags them back to the owner.

Reviewed

The Seed is mature enough for a real gate check. This is the handoff point into the promotion criteria below.

Stay here when the question is whether the Seed has enough proof to become real execution work.

Promoted

The Seed passed the gate and now spawns one or more concrete Work Items for the right execution agents.

Leave the Seed lane once the work exists as a scoped execution unit with an owner and sponsor.

Dormant

The idea stays parked until its wake condition is met instead of pretending to be active work.

Grafton surfaces Dormant Seeds again when the wake condition lands or a wake date passes.

Phase 2

Promotion Gate

A Reviewed Seed only becomes real execution work after it clears the promotion gate. This gate is where Grafton names the missing proof instead of guessing or pushing the Seed through on momentum.
Five checks

Promotion is a proof check, not a vibes check

Use these rows to identify the exact reason a Seed should stay in shaping rather than pretending it is already execution-ready.
Check
Problem framing
Gate rule
Require a falsifiable problem, not a vague wish list.
Why it matters
Grafton can route or delay the Seed, but it cannot decide whether a fuzzy idea is worth doing.
Check
Upside sizing
Gate rule
Require rough upside before promotion.
Why it matters
A Seed without expected leverage is not ready to compete for execution attention.
Check
Proof to convince
Gate rule
Name the evidence that would make the promotion rational.
Why it matters
This keeps the gate about concrete proof instead of momentum or enthusiasm.
Check
Owner and sponsor
Gate rule
Identify both before the Seed moves.
Why it matters
Grafton stewards the lane, but the accountable humans and execution agents still need to be explicit.
Check
First scoped Work Item
Gate rule
Promotion should create at least one execution-ready slice.
Why it matters
If no bounded Work Item can be named yet, the Seed is still shaping rather than shipping.
Phase 3

Work Item

Promoted Seeds spawn bounded execution units. Grafton watches movement through these states, flags unhealthy stillness, and routes clarification when the work keeps bouncing without landing.
Ready

The slice exists, the owner is clear, and execution can begin without another lifecycle rewrite.

This is the state that proves the promotion gate produced a real unit of work instead of a vague promise.

In Progress

Normal execution state. Grafton is watching for movement, not micromanaging the implementation.

Use this when the question is whether the work is healthy quiet or silent drift.

Clarify

Execution hit ambiguity that needs sharper scope, policy input, or a sponsor decision.

Repeated Clarify to review loops are a signal to route the issue to Atticus or the sponsor rather than letting it spin.

Ready for Review

The work is done enough to inspect, but not yet closed.

Grafton watches this state as part of lifecycle health, not as a code-review authority.

Approved

The work crossed the finish line and is about to trigger harvest.

This is the moment where result summary quality matters more than more status narration.

Done

Execution is complete and the loop can now close or wake the next Seed.

Stay here only long enough to run the harvest loop and update the parent Seed correctly.

Loop shape

Annual vs. perennial work

Annual
Discrete work with a real definition of done. It moves through the status pipeline and ends in harvest.
Grafton watches pipeline movement, gate timing, and whether the result summary is ready for closeout.
Perennial
Ongoing loop work that stays active by rhythm and health instead of by marching toward Done.
Grafton watches cadence, yield, and whether the loop is drifting rather than treating it like a stuck task.
Fast rule: If the work should close and produce a harvest, treat it like an annual. If the work should keep running indefinitely, judge it by rhythm instead.
Phase 4

Harvest Loop

When a Work Item reaches Approved or Done, Grafton closes the loop: verify the result, wake anything that depended on it, and plant the next reasonable Seed when the outcome creates a new opportunity.
  1. 1.Verify that the result summary is filled in. If the proof is missing, Grafton routes back to the owner before pretending the work is truly done.
  2. 2.Check Dormant Seeds for wake conditions that this result just satisfied, and reactivate the ones that are now unblocked.
  3. 3.If the result implies follow-on opportunities, create linked Draft Seeds so the next crop starts with context instead of from scratch.
  4. 4.Update the parent Seed only when all related Work Items are complete, so lifecycle truth stays honest.
Arbor Cycle β€” twice daily

Runs at 10:00 and 22:00 CT (cron "0 10,22 * * *"). Gate checks for new or changed Seeds and Work Items, stale-item detection, and harvest triggers when something reaches Approved or Done.

Nightly Observer β€” daily

Runs at 03:30 CT (cron "30 3 * * *"). What moved, what stalled, and which lifecycle events genuinely need human attention.

Weekly Reflector β€” Mondays

Runs Mondays at 05:50 CT (cron "50 5 * * 1"). Project-level trend review: dormant wake conditions, perennial rhythm, and whether the garden is producing more than it is accumulating.

Cadence source: Grafton's live gateway roster, verified during the October 2 cron-roster convergence pass. The registry's stewardship charters run their own registry-verbatim cadences β€” Pruning Shears every six hours, Watering Bucket twice-daily, Rake daily with a weekly synthesis, and Trellis recurring β€” rendered on the Grafton district page.

Leave the route here

If the lifecycle answer is clear but the next move still is not, switch once: Capabilities for owner lookup or Coordination for the handoff pattern.

Keep exploring Grafton in Atlas

Grafton district

Return to the shorter role and integration summary once the lifecycle question is resolved.

Open Grafton district
Capabilities

Go here when the next question is which agent should actually own the execution work.

Open Capabilities
Coordination

Open this route when the lifecycle answer is clear and the remaining question is the handoff pattern.

Open Coordination
Projects & Charters

Map lifecycle stewardship back to the project and charter bodies Grafton is tending.

Open Projects & Charters