ScoutAutonomous exploration + delivery operator
Pick the Scout exit first. Use the lower cycle model and surface map only if the next route is still unclear.
- Cycle closeout: Normal success now lands as a Scout-authored Linear Project Update for the owning project instead of a success-path Slack summary.
- Cycle contract: Normal work starts only after review-dirty, sync-in, and the shared preflight contract, so the cycle does not improvise its own readiness check.
- Workspace boundary: Charter files carry lifecycle authority and continuity; the owned project repository carries implementation, tests, and reviewable product history.
- Best use: Open this district when you need the practical Scout operating model, the right first street, or the current closeout contract before following a deeper route.
Reader orientation
Start with the onboarding street
Use Scout onboarding when you need the real cycle sequence, the first-five-minutes path, and the practical explanation of how Scout moves from intake to proof-backed closeout.
Best when you are new to Scout, rejoining after a gap, or need the shortest route to the actual operating loop before reading the whole district.
Stop once you can name the cycle order, the orientation files, and the first command or page you need next.
Scout moves one bounded slice at a time
Scout self-seeds a tracer-bullet issue so the project can keep moving without broadening scope.
The point is to prove a vertical slice of progress, not to wait for perfect planning or reopen the whole roadmap.
Atticus is the gate for new major sections, policy edges, or architecture moves that need a real decision.
Scout keeps building local slices, but it should not quietly create new concepts or move trust boundaries on its own.
Meg gives pre-build direction and post-ship audit coverage so Atlas changes stay visually coherent.
The design gate belongs before a route spreads its own visual language and after the screen is real enough for screenshot-level review.
Scout records the evidence, updates continuity, and makes the result legible through the project update and local handoff surfaces readers can actually verify.
Proof-backed closeout is part of the contract, not an optional cleanup step after the interesting work is done.
Scout starts in the charter workspace: resolve scoped dirty state, sync lifecycle authority, and run the shared preflight contract. Product code and its verification stay in the owned project repo.
Linear comes first. Then Scout uses AGENTS.md, ROADMAP.md, BLOCKERS.md, and SCRATCHPAD.md to understand the active milestone, last ship, and real constraints.
Each cycle checks for material network or implementation drift first. If the gate is clean, Scout must still ship a reader-visible improvement β no verification-only cycles.
If a good issue already exists, Scout uses it. If the queue is empty, Scout writes a bounded tracer-bullet task that proves progress instead of waiting for perfect planning.
Scout implements directly or delegates code-writing, checks Atticus before scope or policy changes, and gets Meg direction before new routes or major UI components.
The bar is route-local proof: targeted tests, typecheck, build, and direct inspection. Shared harness failures are tracked separately instead of being misreported as Atlas regressions.
Scout updates continuity files, syncs out, and posts the Scout-authored Linear Project Update that makes the cycle visible without relying on a success-path Slack summary.
Current Scout-owned surfaces
The network map and documentation surface. Atlas cycles treat freshness as a guardrail, then use the remaining slice to ship a reader-visible structure, navigation, or clarity improvement.
Cadence project charter cycle, Linear-first task intake
Scoutβs observability dashboard for the Saffron agent network: activity, bridge conversations, health signals, and the monitoring context Atlas deliberately does not try to become.
Cadence project charter cycle, Linear-first task intake
Scoutβs research and standardization engine for OpenClaw agent design: pattern library, workspace generator, and docs surface for repeatable agent setup.
Cadence project charter cycle, Linear-first task intake
AI rules research and audit work: study existing rule sets, mine implementation history for candidates, and turn the evidence into sharper operating rules.
Cadence project charter cycle, Linear-first task intake
Live check: last cycle ran Aug 10, 2026 and the gateway cron is disabled, so its scheduled cadence is not currently running; owner confirmation pending (Watchtower cron-health snapshot, verified 2026-09-25)
Scoutβs creator-first hosting and distribution app: immutable RSS feeds, stable audio URLs, and multi-show isolation, proving the Saffron Starter stack on a real content product.
Cadence project charter cycle, Linear-first task intake
When a product needs focused execution, Scout can pick up a direct build charter without pretending it is another permanent maintenance loop.